Cracks were detected in the catalytic tubes at the top of the equipment, putting the mechanical integrity of the equipment at risk.
Work performed:
- Reformer opening.
- Inspection of Catalytic Tubes.
- Cutting and Disassembly of 280 Catalytic Tubes.
- Installation and special welding of 280 Catalytic Tubes.
- Ultrasonic Inspection of Welds.
- Reformer Closure.