Condition found internal corrosion of the pipes due to exposure to salt water, generating loss of efficiency and shutdown of the section.
Work Performed:
- Opening of the heat exchanger.
- Cutting and Disassembly of 9300 Tubes.
- Internal cleaning of the equipment.
- Installation of 9300 Tubes.
- Inspection, testing and release.
- Exchanger Closing.